Flood control works

Published:

2022-12-09 14:56

Philippine Flood Control Project

Cooperation time:

2018-2019

Cooperative unit:

Philippine

Material supply:

Steel sheet pile,Seamless pipe

The project overcomes a series of problems such as the difficulty of excavation and embankment construction caused by the difficulty of excavation and embankment construction due to the low foundation bearing capacity and high groundwater level, and the construction equipment cannot work normally on this soft foundation. The project was successfully completed, and the building materials and steel required for the project played a major supporting role.

Tel:+86- 15901336550 / +86- 10- 85999901

Address: Rm2522, F/25, Building A, Wanda Plaza, Tongzhou District, Beijing, China 

Email:sarah@sksteel.com.cn

Copyright © 2022 SINO- KOREA (BEIJING) STEEL CO, LTD   Powered by www.300.cn   京ICP备15005777号-1   SEO