Flood control works
Published:
2022-12-09 14:56
Philippine Flood Control Project
Cooperation time:
2018-2019
Cooperative unit:
Philippine
Material supply:
Steel sheet pile,Seamless pipe
The project overcomes a series of problems such as the difficulty of excavation and embankment construction caused by the difficulty of excavation and embankment construction due to the low foundation bearing capacity and high groundwater level, and the construction equipment cannot work normally on this soft foundation. The project was successfully completed, and the building materials and steel required for the project played a major supporting role.